Roll-On, distributed by The Final Floor, Inc. Orders and support: (740) 746-8373

How to Apply

Rink owners apply Roll-On and Traction with their own crews. Watch the video, then follow the printed instructions for your product.

Applying Roll-On Skate Floor Finish

Roll-On application video

Notes on this video

  • The milky look of the floor comes from proper screening with 80 grit mesh.
  • Use a 2 gallon plastic garden sprinkler can. Cut off the top hand-hold and open the hole with a box knife. Pour with the side hand-hold.
  • The zigzag wave pattern is three to four feet wide.
  • On a 65 foot wide floor, one pour is about 1.5 gallons.
  • Use light pressure on the rollers. One hand is enough.
  • Rolling over the same area more than three times wastes time.
  • The person pouring keeps the rollers' lines straight. Add product for a roller who falls behind.
  1. Step 1Abrade the old finishDull the surface with 80 grit mesh screens or sandpaper under a rotary floor polisher. Change sandpaper every 500 square feet.
  2. Step 2Remove the dustVacuum the floor. Then push a damp terrycloth towel across the width with a push broom. Use clear water only. Repeat until the floor is dust free.
  3. Step 3Prepare the finishWork at 68 to 74 degrees F. Pour Roll-On through a fine mesh strainer into a two gallon sprinkling can. Do not dilute it or add thinners.
  4. Step 4Pour across the widthStart about 36 inches from the end wall. Walk backwards at a normal pace across the width of the floor and pour in a steady zigzag.
  5. Step 5Roll it outUse 18 inch commercial rollers with a 3/8 or 1/2 inch nap. Roll with light pressure in five to six foot strokes. Overlap each pass 3 to 4 inches.
  6. Step 6Clean upClean tools with mineral spirits or paint thinner right after coating. Move leftover Roll-On into one gallon paint cans with lids.

Crew and time

Four people can coat 10,000 square feet in no more than an hour and a half. One mixes the pails, one pours, and two roll. A third roller can cut the time by up to 20%.

Pace your pails

A 170 by 70 foot floor takes 5 pails, or 25 gallons. Mark the wall with tape every 34 feet. Check your progress each time a pail is empty.

Air and humidity

Avoid coating when humidity is above 50%. Close the building while you coat and for 4 to 6 hours after. Then ventilate for the rest of the cure. Never point air flow down at the floor.

Applying Traction Wood Floor Coating

Traction application video 1
Traction application video 2
Traction application video 3

The application in six steps

  1. Prepare the floor with the wet screen or dry screen method in the printed instructions.
  2. Tack the floor with damp cotton towels until no dust is found.
  3. Mix the catalyst into Traction. Let it sit for 10 minutes.
  4. Pour a line along the floor and pull it with the Padco floor coater. Overlap the wet area 50% on each pass.
  5. Let the first coat dry 3 to 6 hours.
  6. Apply the second coat with catalyst. Let the floor dry 24 hours.

Do not apply Traction to

  • New or freshly sanded wood. Seal it with Traction Wood Floor Sealer first.
  • Finishes that are peeling, flaking, or poorly bonded.
  • Floors less than 2 years old. Check the flooring manufacturer's warranty first.
  • Floors with heavy finish build-up and sealed-in dirt and marks.
  • Warped floors or floors with gaps wider than 1/8 inch.
  • Parquet floors.
  • Floors treated with oil or coated with wax.
  • Any floor when it is above 85 degrees F or 50% relative humidity.

Printed instructions

Read the full instructions and the label on the can before you start.

Questions before you coat?

Call us for technical support. If you would like a crew to do the work, request an installer.